Public Safety advances in manufacturing

Challenge

  • State-of-the-art electric vehicle manufacturing facilities under construction needed to meet fire safety code requirements
  • Remote location and building material inhibited public safety or cellular signals from entering two buildings ranging in size from 200,000 to 600,000 square fee

Solution

  • Cel-Fi QUATRA RED
  • Cel-Fi QUATRA 4000

Results

  • Compliance with public safety regulations required for a Certificate of Occupancy
  • Reliable cellular coverage throughout the buildings for all four major carriers

Fill out the form to read the full Case Study:

Menu